SiteWire/ BlogTry SiteWire
industry-analysis

City of Burnaby Building Permits Issued: What Contractors Need to Know

City of Burnaby Building Permits Issued: Where to Find Them and What They Mean

The City of Burnaby issues building permits for projects ranging from kitchen renovations to multi-unit developments. These permits are public records, but not all contractors know how to access them efficiently. Burnaby’s online portal updates daily, but the data is buried in spreadsheets and PDFs, hard to scan for actionable leads.

Here’s what you need to know to turn issued permits into jobs:

How to Access Burnaby’s Issued Permits in Real Time

Burnaby’s Open Data portal lists issued permits, but it’s not built for contractors. The data updates weekly, not daily, and lacks contractor contact details. For faster, more actionable leads:

  1. City’s permit search tool: Use the Burnaby Permit Search to filter by date, project type, and status. Export results to CSV for follow-ups.
  2. Third-party platforms: Tools like SiteWire aggregate Burnaby’s permits in real time and add contractor profiles, so you can see who’s pulling permits and reach out before competitors.
  3. RSS feeds: Burnaby offers RSS feeds for new permits, but they’re unfiltered. Pair them with a spreadsheet to track only the project types you target.

Pro tip: Set up alerts for specific project types, like laneway homes, to avoid sifting through irrelevant permits.

Most Common Burnaby Building Permits (And How to Win Them)

Burnaby’s issued permits skew toward smaller, high-frequency projects. Here’s the breakdown from the last 12 months:

Project Type% of Issued PermitsAverage ValuationTypical Timeline
Single-family homes45%$500K to $1.2M6 to 12 months
Laneway homes20%$250K to $500K4 to 8 months
Duplexes15%$800K to $1.5M8 to 14 months
Commercial renovations12%$100K to $500K3 to 6 months
New commercial builds5%$2M to $10M12 to 24 months
Industrial projects3%$1M to $5M12 to 18 months

Laneway homes and duplexes are the fastest-growing segments. Commercial renovations often lead to follow-up work, like electrical or plumbing. Flag these early to position for future contracts.

How Contractors Use Issued Permits to Win Work

Issued permits are a goldmine if you act fast. Here’s a step-by-step workflow contractors use to turn them into jobs:

  1. Filter for your trade: Use Burnaby’s portal or SiteWire to isolate permits for your specialty, like roofing, HVAC, or framing.
  2. Check the contractor: Look up the permit applicant’s name in Burnaby’s contractor registry. Verify their license status and past projects.
  3. Research the property: Pull the address history from the BC Assessment or Landcor to see if the owner has a pattern of renovations or flips.
  4. Reach out within 7 days: Issued permits often lead to bids within 30 days. Send a short email or call referencing the permit number and your availability.
  5. Follow up: If no response, check for updated permit statuses, like “under construction”, to confirm the project is active.

Example: A roofing contractor filters Burnaby’s issued permits for “roof repair” and finds 12 permits in the last month. They cross-reference the applicants with their CRM and discover 3 are repeat clients. They reach out within 5 days and win 2 contracts.

Burnaby vs. Other Metro Vancouver Cities: What Contractors Should Know

Burnaby’s permit ecosystem differs from nearby cities in key ways:

CityAvg. Permits/MonthTop Project TypeLead TimeData Access Speed
Burnaby150 to 200Laneway homes30 to 90 daysReal-time (portal)
Vancouver500 to 600High-rise condos6 to 12 monthsDelayed (weekly)
Surrey300 to 400Single-family homes45 to 90 daysReal-time (portal)
Richmond200 to 250Duplexes60 to 120 daysReal-time (portal)

Burnaby’s smaller, faster projects are ideal for trades like framers, electricians, and plumbers. Vancouver’s high-rises require longer lead times but higher budgets. Contractors should prioritize Burnaby if they need quick turnover.

Burnaby’s issued permits reflect broader trends in Metro Vancouver:

Focus on South Burnaby for laneway home leads. Monitor “change of use” permits for commercial retrofit opportunities. Set up alerts for industrial projects in Brentwood to position early.

Tools to Automate Burnaby Permit Tracking

Manual permit tracking wastes time. These tools help contractors stay ahead:

  1. SiteWire: Aggregates Burnaby’s issued permits in real time and adds contractor profiles, so you can see who’s pulling permits and reach out faster.
  2. Burnaby’s RSS feeds: Set up feeds for specific project types, like “residential”, and use a tool like Zapier to auto-log new permits in a spreadsheet.
  3. Spreadsheet templates: Use a pre-built template, like this one, to track permits, follow-ups, and outcomes.

Pro tip: Combine SiteWire’s alerts with Burnaby’s RSS feeds for a hybrid approach, real-time data with local context.


Burnaby’s issued permits are a steady stream of work for contractors who know how to find them. The key is speed: act within days of issuance to win the bid before competitors even see the project.

If you’re tracking Burnaby’s permits manually, you’re leaving money on the table.

Find construction projects before your competitors.

SiteWire tracks building permits across 31 Canadian cities, contractor profiles, daily alerts, and pre-permit signals, with data kept in Canada.

Try SiteWire

Weekly permit-lead alerts for your trade + city

Get the new building permits worth chasing, matched to your trade and your cities, in a short weekly email. One email to confirm, unsubscribe anytime in one click.

We email a single confirmation link (CASL double opt-in). No spam, one-click unsubscribe on every email.